5C-9 Clutch:
15) Remove the spacer (21).
16) Remove the snap ring (22), oil pump drive gear (23)
and pin (24).
Special tool
: 09900–06107 (Snap ring pliers)
Clutch Installation
B944H15306020
1) Install the pin (1).
2) When installing the oil pump drive gear (2), align the
pin (1) with the slot “A” with the flange side “B” of the
oil pump drive gear facing the primary drive gear.
3) Install the snap ring (3).
CAUTION
!
The removed snap ring (3) must be replaced
with a new one.
Special tool
: 09900–06107 (Snap ring pliers)
4) Install the spacer (4) and apply engine oil to it.
5) Install the primary driven gear assembly (5) onto the
countershaft.
NOTE
When installing the primary driven gear
assembly (5), align the teeth of the primary
drive gears (6) by inserting a suitable bar to
the holes of them.
Be sure to engage the oil pump driven (7) and
oil pump drive gears (2), primary drive (6) and
driven gears (8).
21
I944H1530029-02
24
22
23
I944H1530030-02
2
“A”
“B”
1
I944H1530031-02
3
I944H1530032-01
4
I944H1530033-01
5
6
7
2
8
I944H1530034-02
Summary of Contents for SFV650
Page 1: ...SFV650 SERVICE MANUAL 9 9 5 0 0 3 6 1 9 0 0 1 E...
Page 4: ......
Page 283: ...Engine Lubrication System 1E 4 REAR CYLINDER I944H1150043 02...
Page 420: ...2D 20 Wheels and Tires...
Page 434: ...3A 12 Drive Chain Drive Train Drive Shaft...
Page 472: ...4C 10 Rear Brakes...
Page 572: ...Prepared by December 2008 Part No 99500 36190 01E Printed in Japan 572...
Page 573: ...Printed in Japan K9...