MENU MAPS
_________________________________________________________________________________________________________
10-6
SIG-00-22-02 JUNE 2022 (Revised September 2022)
Version: B.1
10.1.2.2.2
Second Train Output
When Second Train Output Used is set to
Yes
, the Second Train OP is enabled so it can be set
by a logic equation and assigned to an output. Note, that there is no internally controlled Second
Train Output provided, the user has to configure the Second Train Output function through
equations, for example, if AND 2 was used to define one set of track circuits associated with
PSO 1 and AND 3 defines ones associated with PSO 1.
Figure 10-4 Setting Second Train OP