DISPLAY MODULE AND OFFICE CONFIGURATION EDITOR
_________________________________________________________________________________________________________
3-10
SIG-00-22-02 JUNE 2022 (Revised September 2022)
Version: B.1
Figure 3-12 SSCC Lamp Test Options
Once the test is selected, press the ‘5’ key to start the test as shown in Figure 3-13. Pressing ‘5’
again will stop the test.
The test will also automatically stop once the configured Lamp Test Cancel time has expired, or
if the crossing is activated
Figure 3-13 SSCC Lamp Test Start
Option 1: Bell – this will turn the Bell on.
Option 2: Lamp 1– this will turn the lamp 1 on steady
Option 3: Lamp 2– this will turn the lamp 2 on steady
Option 4: Flash the lamps – this will flash the lamps on the selected SSCC module. Note that if
GPs coupled is yes, the lamps on both modules will flash (see Section 4.11.5 for details)
Option 5: Test the Crossing. This will flash the lamps, and run the gate delay time, then when
that expires, drop the gate.
Option 6: Perform a timed test. When this is selected the user can edit the values for Lamp Test
On (default 15s), and Lamp Test Delay (default 30s). When the test is started, the lamps