DISPLAY MODULE AND OFFICE CONFIGURATION EDITOR
_________________________________________________________________________________________________________
3-81
SIG-00-22-02 JUNE 2022 (Revised September 2022)
Version: B.1
If the PAC file already had CDL questions answered, it is not necessary to reperform the CDL
Q&A on the GCP5000 (GCE) provided that no other configuration is changed.
In some cases, the SEAR IIi programming may not be complete when the PAC file was created,
if so, the following steps should be done to complete the setup on the GCP 5000:
1. Load CDL,
2. Load PAC file,
3. Configure any remaining SEAR IIi settings (that were not specified in the PAC file),
4. Run through the CDL Q&A,
5. Install SEAR IIi Echelon modules,
6. Perform the Lamp Calibration procedure,
7. Perform the Battery Calibration procedure.
Figure 3-126 shows the SEAR IIi programming available or the Web UI of the A80485 Display
Module. Similar menus are available on the local user interface of the Display Module.
Figure 3-126 SEAR Program Menus