Maintenance
Function test
11
A6V10421795_en--_k
121 | 151
11.3 Function test
The following schedule is recommended for the function test. However, local
regulations have higher priorities.
Function
Activity
Interval
(years)
1
2
5
↑ Detector line
Activate all automatic detectors and all manual call points.
X
Activate a detector or manual call point per line
X
Check all detectors and manual call points for dirt and check that
usage is in accordance with regulations.
X
Activate a fault, short circuit and open line, and check that usage
is in accordance with regulations.
X
Outputs
Check sounder controls and all acoustic and optical alarm
devices.
X
Activate fire outputs and check the application.
X
↑ RT alarm and check the RT transmission.
X
Inputs
Activate each input and check the application.
X
Alarm organization
↑ Manned.
Activate a detector and manual call point and check the timer T1
and T2 and the RT transmission.
X
↑ unmanned.
Activate a detector and check the RT transmission.
X
Check the DAR functionality for each input and output.
X
Panel
Check date and time.
X
Check the display, button and LEDs.
X
Check earth connections.
X
Activate mains and battery fault condition and verify the
application.
X
Summary of Contents for FC361 Series
Page 6: ......