10.4.3 Function test
WARNING
RT transmission are activated during testing.
You must do the following:
● Inform fire brigade.
● Inform owner of the building.
1.
Execute lamp test. See chapter '
2.
Test each device (detector, MCP, etc.) individually and check the correctness
of the system behavior (e.g. alarm device activation, RT fire, RT fault, Fire
control, etc.). See chapter '
3.
Make sure that the panel is in normal operation, the buzzer and all system
parts are enabled.
The function test is finished.
10.4.4 Completing work
1.
Check date and time on the panel display. If they are not correct, modify them.
See chapter '
2.
Secure the housing cover with a screwdriver.
3.
Complete the installation label (top right of the housing) with the commissioning
date.
The system can now be handed over to the customer.