Prerequisites
Before commissioning is started, the following data must be available:
● Line supply frequency
● Motor rating plate data
● Command/setpoint sources
● Min./max. frequency or ramp-up/ramp-down time
● Control mode
An example for a rating plate is shown in the figure below. The precise definition and
explanation of this data is defined in DIN EN 60034-1.
D-91056 Erlangen
3~Mot.
1LA70904-4AA10
E0107/471101 01 001 IEC/EN 60034
16kg IM B3 090L IP55 Th.Cl.F
50 Hz 230/400 V
cos
220-240/380-420 V
60 Hz 460 V
cos
440-480 V
H
/
/
1.5 kW 5.9/3.4 A
0.81 1420/min
6.2-5.4/3.6-3.2 A
1.75 kW 3.4 A
0.81 1720/min
3.6-3.3 A
Figure 5-2
Example of a typical motor rating plate
Note
If the inverter is to be commissioned from a defined state, it can be reset to its default
settings by performing a factory reset (see section "Reset Parameters to Factory Settings")
NOTICE
Parameters can be changed independent whether an MMC is plugged in or not. Depending
on the settings in P8458 after power cycle the parameters from EEPROM or MMC are used
for start up. The customer has to take care that the parameter set used for start-up is valid
(see also "Start-Up Behavior").
WARNING
In case of automatic parameter download from the MMC at start up, F0395 will be
generated. Clearing F00395 is described in the section "Message F00395" of this manual.