Commissioning
5.7 Commissioning with the MMC
Control Units CU240S
100
Operating Instructions, 07/2008 - FW 3.2, A5E00766042B AD
Manual Download of a parameter set with an MMC
Prerequisites
● Supply voltage is active for the download inverter
● The download inverter is in "Ready State"
● On the MMC the following folder structure must be available:
/USER/SINAMICS/DATA/clonexx.bin
Procedure
Note
The following important conditions must be fulfilled when using the download procedure:
•
During the download the inverter will not react to any commands.
•
Once the download procedure has started, it cannot be interrupted.
•
After upload and download of parameters between differing Control Units, parameter
settings must be checked.
•
Parameter download from a different CU might fail with F0063 if parameters cannot be
downloaded (Check P949 for the (first) parameter number which cannot be downloaded).
•
If the download fails, the inverter reverts to the previous parameters from the EEPROM.
Parameter
Description (Parameter name and factory setting (if not variable) in bold)
Setting
Insert the MMC to the download inverter and perform the Manual Download according the
flow chart.
P0010 = 30
Commissioning parameter*
0: Ready
1: Quick commissioning
2: Inverter
30: Factory setting, parameter transfer
95: Safety commissioning (for CUs with fail-safe functions only)
P0804 = …
Select Clone file (for download)
0: clone00.bin
…
99: clone99.bin
P0803 = 2
Transfer data to EEPROM
0: Disabled
1: Start BOP Transfer
2: Start MMC Transfer
If the download has been completed successfully, P0010 and P0803 will be set to 0 and the
"RDY" LED is on.
If the upload has failed, F0061 (MMC-PS not fitted), F0062 (MMC-PS contents invalid) resp.
F0063 (MMC-PS contents incompatible) or F0051 (failure while accessing EEPROM) will be
displayed, LED "SF" (red) is on.
In this case insert a proper MMC and attempt another download or perform a factory reset.
After a successful Manual Download the MMC can be removed from the inverter and inserted
into the next download inverter. Then perform the download steps again until the series
commissioning has been completed for all inverters.