![Sharp IQ-8900 Operation Manual Download Page 179](http://html.mh-extra.com/html/sharp/iq-8900/iq-8900_operation-manual_371035179.webp)
4. Enter the ending date.
5. Touch
The number of days between the two dates is shown.
l
if you make a mistake, touch
to return to a
previous step.
l
If you
invalid date or other value, for example
if you forget to enter the year, the operation will not be
nized and nothing will happen when you touch
Calculating a date by specifying a number of days
1.
Touch
to call the date calculator.
The current date is the default starting date. If you want
to calculate a date from the current date, skip the next
step.
2. Touch
to clear the starting date field and enter
the desired starting date. Prefix a single-digit month or
date with a 0.
You can also modify a specific part of a date by touching
it, then entering the desired numbers.
3. Touch
to obtain a date in the future, or
for a date in the past.
Touch
or
, respectively.
4. Enter the number of days to base your calculation on.
5. Touch
The date is displayed.
178
Summary of Contents for IQ-8900
Page 1: ......
Page 45: ......
Page 47: ...Part Names and Functions CAPS 2nd ii q Gq SPACE I N S xq E N T E R i J 46 ...
Page 61: ...60 ...
Page 80: ... I I I 1 I I l 79 ...
Page 85: ...84 ...
Page 125: ...724 ...
Page 139: ...138 ...
Page 173: ...172 ...
Page 219: ...218 ...
Page 279: ...278 ...
Page 291: ...290 ...
Page 311: ......
Page 318: ...X XMODEM transfer protocol 264 317 ...
Page 319: ... MEMO ...
Page 320: ... MEMO ...
Page 322: ...SHARP CORPORATION ...