Schematic procedure
Project Planning
6
Project Planning
6.1
Schematic procedure
→
Clarification of
•
Technical data and requirements
•
Basic conditions
•
System interfacing
↓
Calculating the relevant application data
•
Stationary, dynamic, regenerative power
•
Speed
↓
Gear unit selection
Determine
•
gear unit version, gear unit size, gear unit reduction ratio
Check the gear unit utilization (M
amax
≥
M
a
(t))
↓
→
Motor selection
•
Convert torque and speed for the motor shaft
•
Define the motor
↓
←
Check
•
Maximum occurring torque M
max
< 1.5 x M
N
•
Required motor speed < n
N
•
Thermal load by taking into account setting range and cyclic duration factor
↓
Selecting the MOVITRAC
®
B frequency inverter
•
Motor/inverter assignment
•
Continuous power, peak power
•
Installation conditions
•
FBG11B keypad option
•
DBG60B plain text keypad option
•
FSC11B communication option
•
FIO11B analog module option
•
UWS11A / UWS21B / USB11A interface adapter option
↓
Selecting the braking resistor
•
based on the calculated regenerative power and the cyclic duration factor cdf
↓
Grouping components
•
Line choke, output choke, touch guard
↓
←
Check whether all requirements are met.