Chapter 2 Installation
Accura 2300S/2350-1P3FSC User Guide
Page 50
ⓒ
2015 Rootech Inc. All Rights Reserved
Installation Location of
Accura 2350-1P3FSC
Module
Accura 2350-1P3FSC module performs measurements in three single-phase feeders with the same
current ratings at the same time. Among 6 power lines of the three feeders, the four lines placed close
to the center of where cables are connected should be installed to pass through the holes of the
module.
Fig 2.32 Location of the Cables Passing Through the Holes of Accura 2350-1P3FSC
Module
Measurement Principle of Accura 2350-1P3FSC Module
In the first feeder, the current flowing from the load to the source in the reverse direction is measured
while the current flowing from the source to the load in the normal direction is measured in the 2nd
and 3rd feeders.
Improper Cable Installation
Proper Cable Installation