background image

List of Parts (continued)

24” x  57”

24” x  31

 

¼”

24” x  21

 

¾”

24” x  32

 

¼”

24” x  15

 

½”

QTY

Panels

W-1

Steps 
2,3,4,8

Step 8

Step 5

Step 4

Steps 

4,5

W-2

42

4

2

W-3

W-4

2

W-5

4

WARNING: Use extreme caution when handling 

panels with cut edges. The corners are sharp.

QTY

Brace

B-9

4

Step 8

24” x  65”

QTY

Assembled Doors and Vents

D-2L

Step 10

1

D-2R

Step 10

1

Step 9

V-2

4

24” x  24

 

¾”

D-2R

D-2L

WWW.RSIWW.COM

5 of 46 

QTY

Connectors

55

B-3

B-4

B-5

B-1

6

Steps 

4,6

B-2

6

Step 5

B-7

6

Steps 

2,3,4,5,10

Steps 

1,2,4,7

Step 8

27

24

Steps 

5,6,7

B-8

4

Step 1

Summary of Contents for Monticello 8x20

Page 1: ...MonticelloTM 65 Fleetwood Drive Rockaway NJ 07866 Customer Service 877 373 3078 Email customerservice risww com Made in the USA WARRANTY 10 YEAR 8 x 20 Greenhouse Assembly Instructions 071812...

Page 2: ...y maintain the greenhouse Please read these instructions completely before you begin Thank you for purchasing your MonticelloTM 8x20 Greenhouse The Monticello line is proudly made in the USA by a lead...

Page 3: ...small children Keep children and pets away from the assembly area until the work is completed Always wear work shoes gloves and safety goggles when working Some of the parts have sharp edges and burs...

Page 4: ...to ensure it is level at every point If you are not building on a wood deck we recommend constructing a wood platform so you can properly secure the greenhouse You must assure your foundation is squar...

Page 5: ...epare for each step according to instructions in this manual If any parts are missing or damaged contact Riverstone Customer Service before beginning assembly Customer Service 877 373 3078 or email cu...

Page 6: ...G Use extreme caution when handling panels with cut edges The corners are sharp QTY Brace B 9 4 Step 8 24 x 65 QTY Assembled Doors and Vents D 2L Step 10 1 D 2R Step 10 1 Step 9 V 2 4 24 x 24 D 2R D 2...

Page 7: ...10 6 of 46 WWW RSIWW COM QTY Included Tools T 1 Steps 8 9 10 11 Steps 1 2 3 4 5 6 7 8 10 1 T 3 Steps 2 3 4 1 T 4 Step 8 4 T 2 1 Wrench Phillips Screwdriver 23 Spacer 5 Bungee Cord 4 QTY Vent Opener V...

Page 8: ...rk shoes gloves and goggles QTY Profile 4 P 1A 4 P 1B 3 P 2A 3 P 2B The base is made up of four P 1A four P 1B three P 2A and three P 2B profiles Arrange profiles in a rectangle as shown Position P 2A...

Page 9: ...show the set screw placement IMPORTANT When assembling base make certain the profiles are straight and flush against each other Secure profiles together and ensure corners are square The diagonal meas...

Page 10: ...r size is not shown proportionally in this drawing Make certain corners line up and are flush Adjust position of set screws in inner bolt track to fit holes in B 8 connector Secure with four bolts Rep...

Page 11: ...t slides easily into bolt tracks After inserting into bolt track screw in until it holds in place Make certain the pieces are in the correct positions before assembling Carefully follow the order of a...

Page 12: ...EWS ARE FROM OUTSIDE IMPORTANT The panels expand and contract depending on the temperature To ensure proper placement use the 23 inch spacer included with the tools 2 2A 2 2B 2 2C Begin at front right...

Page 13: ...profiles by sliding four set screws into bottom bolt track Hand tighten each end set screw to hold in place Prepare three G 2 gutter profile with six set screws and one G 2 gutter profile with five se...

Page 14: ...w is centered Fit B 5 connector onto gutter and hold in place using the two end bolts Loosen set screws on side profiles and slide down Fit wide part of B 3 connector onto set screw slide up into plac...

Page 15: ...e two F 10 profiles Slide set screws into both bolt tracks on each end of two F 10 profiles Hand tighten each set screw to hold in place F 6 F 6 F 10 F 10 NOTE Set screw in center bolt channel is used...

Page 16: ...base and corner profile placing side marked UV Resitant facing outside B 3 S 2C 4 2 Connector QTY W 1 1 Panel QTY 24 x 57 B 3 S 2C 6 3 Connector QTY W 1 3 Panel QTY 24 x 57 NOTE Panels will not fit c...

Page 17: ...rs Fit B 1 connector to profiles as shown S 2C 9 Connector QTY B 1 3 Working from inside right corner place F 6 profile with mitered end next to corner and angled edge facing up onto corner W 1 panel...

Page 18: ...in place Make certain the pieces are in the correct positions before assembling Carefully follow the order of assembly to ensure an easy installation Wear proper safety gear including work shoes glov...

Page 19: ...ner Remove plastic film from both sides of one W 1 panel Fit panel into channel in base and corner profile placing side marked UV Resistant facing outside B 3 S 2C 22 11 Connector QTY W 1 10 Panel QTY...

Page 20: ...ter Seams are centered to bolt tracks in F 1 profiles S 2A S 2B 2 2 Prepare two G 1 gutter profiles by sliding four set screws into bottom bolt track Hand tighten each end set screw to hold in place P...

Page 21: ...rt of B 3 connector onto set screw slide up into place fitting gutter set screw at other end Tighten set screws and secure with bolts B 3 S 2C 42 11 Connector QTY B 5 5 Connector QTY B 3 B 3 B 5 F 7 G...

Page 22: ...d Hand tighten each set screw to hold in place F 6 F 6 5 2A 5 2B 5 1A 5 1B Prepare two F 1 wall profiles Slide set screws into same bolt track one on each end of profile Position profile so set screw...

Page 23: ...panel into channel in F 1 profile and slide F 1 profile against spacer to ensure proper placement IMPORTANT The panels expand and contract depending on the temperature To ensure proper placement use t...

Page 24: ...nside front right corner install F 1 profile next to W 1 panel Place 23 inch spacer on base next to F 7 corner profile and slide F 1 profile against spacer to ensure proper placement F 1 W 1 F 7 F 6 G...

Page 25: ...le to F 5 profile and adjust set screws to fit B 2 connector Secure with three bolts Turn profiles over and place on flat surface Slide two set screws into bolt tracks of F 4 and F 5 profiles Repeat s...

Page 26: ...s placing side marked UV Resistant facing outside NOTE VIEWS FROM INSIDE NOTE VIEWS FROM INSIDE W 5 2 Panel QTY 24 x 21 B 2 B 2 F 5 Secure with two bolts Ensure height to base is 65 S 2C 2 Connector Q...

Page 27: ...cure with bolts Repeat on other side Check inside corners to ensure B 7 connector is still in proper position If it needs adjusting repeat steps 5 8 and 5 9C through 5 9D until each corner is set S 2C...

Page 28: ...aution when handling F 7 F 7 Prepare two F 7 corner profiles Slide set screws into the same bolt track one on each end of profile Tighten each set screw to hold in place WWW RSIWW COM 27 of 46 NOTE Ha...

Page 29: ...nnector 6 4A 6 4B Secure each B 1 connector with four bolts F 6 F 10 F 10 F 3 F 3 F 1 F 1 F 1 F 2 Work from outside to add B 1 connectors in the same position Loosen set screws on profiles and adjust...

Page 30: ...outside 6 6A 6 6B 6 6C From outside fit F 7 profiles into each side of back Arrange the profile so channel lines up with tops of panels and the set screws on each end are visible Begin with either ri...

Page 31: ...5 connectors using a total of eighteen set screws and four long hex bolts Arrange profile so bolt track is facing up Slide set screws into bolt track on each end of profile as shown S 2A S 2B 18 S 5A...

Page 32: ...e ensure all pieces are still flush and secure roof ridge to front Loosen set screws and adjust position to fit holes in C 2 connector Secure with three bolts Make sure end of roof ridge is flush to p...

Page 33: ...Slide one set screw into bolt track on each end of profile Tighten to hold in place F 1 F 1 F 1 F 1 F 1 F 1 F 1 F 1 F 1 F 1 195 8 498mm F 1 F 1 F 1 F 1 F 1 F 1 F 1 WWW RSIWW COM 32 of 46 NOTE Have the...

Page 34: ...require slight force to install Do not use excessive force or you may move profiles out of position When you are having dificulty sliding the panels use dish soap with water on the edges as a lubrican...

Page 35: ...m back right corner remove plastic film from both sides of one W 1 panel With side marked UV Resistant facing outside fit top end of panel into channel in R 1 roof ridge near corner Push panel into ro...

Page 36: ...ntil the other end rests on gutter ledge and then slide towards F 1 profile at back Hold two profiles together in place at ridge using one B 4 connector Line up center hole with long hex bolt in roof...

Page 37: ...ide B 4 S 2C 6 3 Connector QTY W 1 2 Panel QTY 24 x 57 W 1 W 1 NOTE VIEWS FROM INSIDE NOTE VIEWS FROM INSIDE NOTE VIEW FROM OUTSIDE Remove next bungee cord and continue working from back to install se...

Page 38: ...til the other end rests on gutter ledge and then slide towards F 1 profile at back Repeat to install W 1 panel on left 8 6D W 1 W 1 NOTE VIEW FROM OUTSIDE Hold two profiles together at ridge using one...

Page 39: ...l next two W 1 panels and F 1 profiles NOTE VIEW FROM OUTSIDE Remove plastic film from both sides of one W 1 panel With side marked UV Resistant facing outside install the next panel on the right at t...

Page 40: ...ght angle sliding all the way into profile Fit other end into opposite profile If necessary apply slight pressure to bend panel and snap into place W 1 F 1 F 1 F 7 W 1 W 2 NOTE VIEW FROM OUTSIDE W 2 4...

Page 41: ...nd G 2 gutter profiles to hold roof panels in place Working from outside begin at front corner Position G 4 trim plate over gutter and use handle of screw driver to tap into place Use two G 4 and thre...

Page 42: ...s in end of cylinder line up with holes in arm A Push arms apart if necessary Secure with a threaded stud on each side Turn adjusting screw clockwise until arms are aproximately 6 apart Repeat steps 9...

Page 43: ...n attach the other arm of opener to top of inside W 2 profile Screw two S 1 screws through panel and into gripping channel on other side to secure Do not over tighten as it may damage the vent Repeat...

Page 44: ...ile D 1L 1 D 1R 1 37 B 2 F 5 F 4 NOTE VIEW FROM OUTSIDE NOTE ALL VIEWS FROM OUTSIDE NOTE ALL VIEWS FROM OUTSIDE D 1R D 1L D 1L F 5 F 7 D 1R F 7 F 5 IMPORTANT Position D 1L and D 1R door tracks with li...

Page 45: ...Y 44 of 46 WWW RSIWW COM B 3 D 5 B 3 B 3 D 4 D 4 D 1L D 1R F 1 P 1B P 1A F 1 Working from the outside apply the D 4 door sealant tape to the outside of F 1 profiles that make up the door frame This ta...

Page 46: ...d Doors QTY From the inside place the D 5 door guide bracket into the channel in the base profile lining holes in bracket with holes in bottom door Use two S 3 screws to secure Repeat to install one b...

Page 47: ...2A 11 2B A 2 10 Bracket QTY A 1 10 Ground Anchor QTY S 2C 20 S 4 89 Connector QTY S 4 Attach each anchor bracket with two set screws in the inside bolt channels in base profile Secure each with two b...

Reviews: