Assemble Right Wall
2.1A
2.1B
2.1C
Hand tighten each set
screw to hold in place.
Prepare nine F-1 wall profiles. Slide set screws into both bolt tracks on one end of profile and
one bolt track on the other end. The single set screw will sit on the inside of the greenhouse
near the base when installed.
F-1
F-1
F-1
F-1
F-1
F-1
F-1
F-1
F-1
S-2A
S-2B
37
37
QTY
Profile
56”
56”
2
F-7
F-1
9
WWW.RSIWW.COM
10 of 46
NOTE: Have the hex shaped indent facing up. Screw in until it is flush with bottom of nut so
it slides easily into bolt tracks. After inserting into bolt track, screw in until it holds in place.
Make certain the pieces are in the correct positions before assembling.
Carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including work shoes, gloves and goggles.
Prepare needed set screws as shown in step 1.1A
NOTE: Set screw in center bolt channel is used when installing optional
shelving units. Install F-7 profile with set screw near base until needed.
Prepare two F-7 corner profiles. Slide set screws into all three
bolt tracks on one end and into two side bolt tracks
on other end of corner profiles. Hand tighten
each set screw to hold in place.
F-7
F-7