B-7
S-2C
4
2
Connector
QTY
Continue working from inside. Line up F-2 and F-3 profiles with F-1 profiles as shown. Loosen
set screws and adjust position to fit holes in B-1 connectors. Make sure profiles are straight.
NOTE: VIEW FROM INSIDE.
NOTE: VIEW FROM OUTSIDE.
6.2
6.3A
6.3B
S-2C
Connector
QTY
3
S-2C 12
Connector
QTY
B-1
3
Secure with bolt in each
B-1 connector.
6.4A
6.4B
Secure each B-1
connector with four bolts.
F-6
F-10
F-10
F-3
F-3
F-1
F-1
F-1
F-2
Work from outside to add B-1 connectors in the same position. Loosen set screws on profiles
and adjust position to fit holes in B-1 connectors. Fit B-1 connector to profiles as shown.
B-1
B-1
B-1
F-6
F-10
F-10
F-3
F-3
28 of 46
WWW.RSIWW.COM
From inside, add connector B-7 to each corner. Secure each with two bolts.
G-1
F-6
G-1
F-6
G-1
F-7
F-6
B-7
IMPORTANT: Bolt track of F-6 front profile is
lower than bolt track of G-1 gutter profile.
NOTE: VIEWS FROM INSIDE.