Fit B-3 connector and secure with two S-2C bolts.
Continue building the side wall from the inside. Use the spacer with each panel and the eight
remaining F-1 profiles. Repeat steps 4.2A through 4.2C.
Place 23 inch spacer on base next to F-7 corner profile. Fit panel
into channel in F-1 profile and slide F-1 profile against spacer to ensure
proper placement. Position F-1 profiles so single set
screw is next to base on inside.
4.2A
4.2B
4.2C
4.2D
4.3
Continue working from inside back left corner. Remove plastic film
from both sides of one W-1 panel. Fit panel into channel in base and
corner profile, placing side marked “ UV Resistant” facing outside.
B-3
S-2C
22
11
Connector
QTY
W-1
10
Panel
QTY
24” x 57”
B-3
B-3
B-3
F-7
F-1
NOTE: VIEW FROM INSIDE.
NOTE: VIEW FROM OUTSIDE.
W-1
W-1
F-7
F-1
spacer tool
IMPORTANT: The panels expand and contract depending on the temperature.
To ensure proper placement, use the 23 inch spacer included with the tools.
NOTE: Panels will not fit completely to end of channels.
There will be some space to allow for temperature changes.
Add the last W-1 panel to complete the side. From the outside, fit F-7 corner profile into
place and secure.
18 of 46
WWW.RSIWW.COM