8.9
Have one person stand outside the greenhouse to observe the position of the
roof ridge while the other person installs the four B-9 braces. The set screws
should be in the correct position, but if the roof is not completely straight,
loosen the set screws and adjust the brace to raise or lower the roof line.
Secure each with two bolts.
8.11
Screw G-3 gutter drain into holes in C-1 connectors. Make sure they point down.
8.10
The G-4 and G-4E trim plates snap into G-1 and G-2 gutter profiles to hold roof panels in place.
Working from outside, begin at front corner. Position G-4 trim plate over gutter and use handle of
screw driver to tap into place. Use two G-4 and three G-4E trim plates on each side. Make sure
the seams of the trim plates are flush with each other and to the C-1 connectors at the front.
NOTE: There may be a slight gap at the rear C-1 connector depending on weather conditions.
B-9
S-2C
8
4
Brace
QTY
QTY
Trim Plate
G-4
4
G-4E
6
49
⅜”
48½”
B-9
NOTE: VIEWS FROM OUTSIDE.
NOTE: VIEWS FROM INSIDE.
G-4
W-1
G-1
F-7
C-1
C-1
G-3
G-4
F-7
W-1
G-1
NOTE: View shows alignment
of G-4 and G-1 only.
G-3
4
Gutter Drain
QTY