List of Parts
The greenhouse is shipped in seven cartons. These cartons are heavy. Use care when lifting them.
Some parts have sharp edges. Use extreme caution when handling.
Wear proper safety gear including work shoes, gloves and safety goggles.
Keep children and pets away until assembly is complete.
Finish assembling the roof in one session. Do not leave the roof unattended until it is completely assembled.
Place all like parts together in a staging area. Prepare for each step according to instructions in this manual.
If any parts are missing or damaged, contact Riverstone Customer Service before beginning assembly:
Customer Service: (877) 373-3078 or email: [email protected]
WARNING: Profiles with cut edges and/or drilled holes
are sharp. Use extreme caution when handling.
4 of 46
WWW.RSIWW.COM
8
F-7
4
F-6
Steps
5,6
Steps
2,3,4,
5,6
QTY
Profile
Step 6
Step 5
Step 5
Steps
5,6
Steps
2,3,4,
5,8
1
F-1
F-2
1
F-4
1
F-5
4
F-3
41
56”
31”
15
⅞”
20
½”
47
¼”
23”
56”
2
F-10
4
R-1
G-1
G-2
QTY
Profile
Step 3
Step 7
Steps
2,4
Steps
2,4
2
R-1E
Step 7
3
8
25
½”
48
½”
48
½”
49
¾”
23”
P-1B
Step 1
P-1A
Step 1
4
4
P-2B
Step 1
3
P-2A
Step 1
3
50½”
52⅛”