T
echnical
B
ulletin
PAGE: 13/24
Model:
Leo-C2/P2
Date:
05-July-18
No.:
RD0A5023
Setting the OPC Drum to its Optimal Position Defined at the Factory
Set the drum to its optimal position in correlation with the development roller as
determined at the factory in the following procedure.
1. Set the development unit on the rails.
2. Set the OPC drum so that the mark [A] on the flange of the drum aligns with the mark
[B] on the drum shaft.
・
There are two kinds of marks on the drum flange and shaft – ‘I/I’ and ‘+/T’. You
can choose which mark to align, but make sure to align the ‘I’ mark with the ‘I’
mark or the ‘+’ mark with the ‘T’ mark.
3. Set the charger unit.
Summary of Contents for Leo-C2/P2
Page 213: ...Technical Bulletin PAGE 3 4 Reissued 18 Oct 18 Model Leo C2 P2 Date 14 Sep 18 No RD0A5034a...
Page 241: ...Technical Bulletin PAGE 6 51 Reissued 1 Mar 19 Model Leo C2 P2 Date 27 Dec 18 No RD0A5038b...
Page 268: ...Technical Bulletin PAGE 33 51 Reissued 1 Mar 19 Model Leo C2 P2 Date 27 Dec 18 No RD0A5038b SC...