Operating Procedures
5-18
PyroMark Q24 MDx User Manual 01/2016
5.5.1
Instrument software
The instrument is controlled via the six buttons underneath the
screen.
Runs are started and monitored through the instrument
software. During processing of a run, the software displays
the following information:
1.
Run name
2.
Selected well
3.
Current time
4.
Instrument status
5.
Pyrogram
6.
Warning messages
7.
Estimated remaining run time
(hh:mm)
5.5.2
Starting the instrument
1.
Before switching on the instrument, ensure that the mains
plugs are connected to properly grounded (earthed)
mains outlets with the correct voltage and frequency and
that mains plugs are easily accessible in case the
instrument needs to be disconnected quickly from mains
power.
2.
Switch on the instrument. The power switch is located at
the rear of the instrument (see image in Section 3.4).
Summary of Contents for PyroMark Q24 MDx
Page 68: ...Maintenance 6 10 PyroMark Q24 MDx User Manual 01 2016 This page intentionally left blank ...
Page 76: ...Troubleshooting 7 8 PyroMark Q24 MDx User Manual 01 2016 This page left intentionally blank ...
Page 82: ...Glossary 8 6 PyroMark Q24 MDx User Manual 01 2016 This page intentionally left blank ...
Page 98: ...Appendix B B 16 PyroMark Q24 MDx User Manual 01 2016 This page intentionally left blank ...
Page 100: ...Appendix C C 2 PyroMark Q24 MDx User Manual 01 2016 This page intentionally left blank ...
Page 103: ......