6. Maintenance
AUTOMATIC PETRO PYROLYSIS MERCURY ANALYZER – MERCURY/PE-1000
49
No.600-2111-09
(6) Loosen the metal nut of the reducing T-joint.
(7) Move heaters H1, H2, and H3 to the left, and then remove the reducing T-joint.
(8) Loosen the nut of the T-joint on the right side of the collection tube, and pull the
collection tube out to the left. If it is difficult to hold and pull the collection tube out
because of its shortness, remove the cover of heater H5 and then pull the
collection tube out.
(9) Remove the T-joint.
(10) Using the supplied flat ratchet wrench, remove the four screws that fix the cell