4. Installing the equipment
AUTOMATIC PETRO PYROLYSIS MERCURY ANALYZER – MERCURY/PE-1000
9
No.600-2111-09
Installing the equipment
4.1. Installation conditions
Installation environment
Room temperature
:
15°C to 35°C
Vibration
:
Avoid any vibrations that the human body can
strongly sense.
Dust and dirt
:
Maintain a clean atmosphere without any
smoke, dust, or other factors that can adversely
affect measurements. Please also refrain from
smoking anywhere near.
Installation space
:
A minimum area of 1,000 mm wide x 800 mm
deep is necessary. Ensure a firm foundation
(without any wobble) capable of bearing
approximately 60 kg.
Others
:
Avoid direct exposure to sunlight and air from air
conditioners, fans, etc.
Special notes
:
Never place the equipment anywhere volatile
halogen-based reagents such as organ chlorine
solvents are used. In addition, avoid anywhere
such gases may be present.
Power requirements
Voltage
:
Single phase 100,110,120,220,230, or 240VAC,
50/60 Hz
(Selected before shipment.)
Voltage fluctuation
:
Within
±
5 %
Capacity
:
1.0 kVA (3-pin socket)
Power quality
:
No surges, harmonics, noise, etc.
Distance between the power source and the equipment :Within 2 m