4. Installing the equipment
AUTOMATIC PETRO PYROLYSIS MERCURY ANALYZER – MERCURY/PE-1000
13
No.600-2111-09
(4) The connection of the drain Pump
Pass through the hole the line.
Remove the grommet and pass through
the cable of the Pump.
Connect the cable with the line connector of the PE-
1 inside.
Draw the cable from the upside opening.
Insert the PFA tube(2X3) from the undersurface of
the top plate.
Pull out the tube about 5cm from the hole .