![NetApp AltaVault AVA400 Administration Manual Download Page 215](http://html.mh-extra.com/html/netapp/altavault-ava400/altavault-ava400_administration-manual_1669933215.webp)
NetApp AltaVault Cloud Integrated Storage Administration Guide
215
Beta Draft
Adding disk shelves
System maintenance AVA-400, AVA-800
8.
Turn the on/off switch on the power source and the power supply to the ON (|) position. Verify that the power
supply is working correctly by observing that the power LED is lit green and the fault LED is not lit.
9.
Repeat these steps for the remaining power supplies, if any.
Adding disk shelves
You can add a new AVA10S shelf to a configured and running AVA400 or AVA800 appliance. The maximum number
of supported shelves is three for the AVA400 and four for the AVA800 models.
For instructions on installing the AVA10S shelves, and for general safety guidelines, see the guide,
Installation and Service Guide
for DS4243, DS2246, DS4486, and DS4246
. The AltaVault AVA10S shelf is identical
to the DS4246 disk shelf.
Changing the shelf ID for a disk shelf
If a change to a shelf ID is required, such as when expanding existing AltaVault capacity with a new shelf addition,
perform the following steps:
1.
If running, shut down the AltaVault Controller as described in
“Shutting down the AltaVault controller” on
2.
Attach the power cable to the new shelf. To power on the disk shelf for both power supplies, flip the power switches
to the on (|) position, as seen below.
3.
a. Remove the left ear cover by using one hand to hold the left ear cover between your thumb and index finger.
Summary of Contents for AltaVault AVA400
Page 2: ...Beta Draft ...
Page 10: ...Beta Draft Contents ...