AFTER INITIAL SETUP
161
5
AFTER INITIAL SETUP
This chapter describes the procedure for cleaning sites.
Cleaning The Site
When the tasks described in Chapter 2 and Chapter 3 are completed, execute or
confirm the following items.
1
Clean inside of the frame, specially around ventilation, FAN, and the bottom
of the frame.
2
Clean around the frame, the rectifier, and the MDF.
3
Collect and organize all of the test equipment, tools, and so forth that was
used during the installation tests.
4
Dispose of dust, trash, and so forth.
Summary of Contents for WL1700-MS
Page 1: ...V1 WL1700 MS Installation Guide NWA 027515 001 ISSUE 1 0 ...
Page 30: ...Introduction xxviii ...
Page 76: ...Installation Procedures Chapter 2 BEFORE INSTALLATION 42 ...
Page 106: ...Access Point Installation Chapter 3 INSTALLATION 72 ...
Page 154: ...Data Assignment Chapter 4 INITIAL SETUP 120 ...
Page 166: ...Data Assignment Chapter 4 INITIAL SETUP 132 ...
Page 168: ...Data Assignment Chapter 4 INITIAL SETUP 134 ...
Page 171: ...Data Assignment Chapter 4 INITIAL SETUP 137 ...
Page 175: ...Data Assignment Chapter 4 INITIAL SETUP 141 ...
Page 188: ...Data Assignment Chapter 4 INITIAL SETUP 154 3 Configure WLAN Network ...
Page 194: ...Data Assignment Chapter 4 INITIAL SETUP 160 ...
Page 196: ...Cleaning The Site Chapter 5 AFTER INITIAL SETUP 162 ...
Page 216: ...Power Unit Replacement Chapter 6 SYSTEM MAINTENANCE 182 ...
Page 226: ......