Installation Procedures
Chapter 2
BEFORE INSTALLATION
40
Installation Procedures
WL5100/SCA-WL10
The following are installation procedures in the case of WL5100 and SCA-WL10.
Insert it to
SV7000MS/MPC module
For SCA-WL10
Mounting the WL Controller into 19-inch rack
(
Mount it into 19-inch rack
START
Connect AC code
Connect to Setup PC
End
For WL5100
Connect an AC Code to the WL Controller
(
)
Connect a PC with the WL Controller
(
Install Access Points in the appropriate positions
(
)
Insert SCA-WL10 into the expansion slot of SV7000 MPS /
MPC
(
Assign data for WL5100/SCA-WL10 and Access
Points
– When using Command Line Interface
(
)
– When using WebView
(
Access Point Installation
Data Settings
Summary of Contents for WL1700-MS
Page 1: ...V1 WL1700 MS Installation Guide NWA 027515 001 ISSUE 1 0 ...
Page 30: ...Introduction xxviii ...
Page 76: ...Installation Procedures Chapter 2 BEFORE INSTALLATION 42 ...
Page 106: ...Access Point Installation Chapter 3 INSTALLATION 72 ...
Page 154: ...Data Assignment Chapter 4 INITIAL SETUP 120 ...
Page 166: ...Data Assignment Chapter 4 INITIAL SETUP 132 ...
Page 168: ...Data Assignment Chapter 4 INITIAL SETUP 134 ...
Page 171: ...Data Assignment Chapter 4 INITIAL SETUP 137 ...
Page 175: ...Data Assignment Chapter 4 INITIAL SETUP 141 ...
Page 188: ...Data Assignment Chapter 4 INITIAL SETUP 154 3 Configure WLAN Network ...
Page 194: ...Data Assignment Chapter 4 INITIAL SETUP 160 ...
Page 196: ...Cleaning The Site Chapter 5 AFTER INITIAL SETUP 162 ...
Page 216: ...Power Unit Replacement Chapter 6 SYSTEM MAINTENANCE 182 ...
Page 226: ......