5-28
CORRECTIVE MAINTENANCE
GGS-000548-01E
iPASOLINK EX Advanced: O
PERATION
& M
AINTENANCE
5.
Retrieve the
Current Status
, and check if the
ETH-OAM LOC
alarm is cleared.
YES:
This step ends the procedure.
NO:
Go to Step
6.
Check the MEG/MEP Configuration on the far-end site.
7.
Is MEG/MEP Configuration on the far-end site appropriate?
YES:
Contact NEC.
NO:
Correct them, and go to Step
8.
Retrieve the
Current Status
, and check if the
ETH-OAM LOC
alarm is cleared. If
the alarm is not cleared, contact NEC for the further maintenance support.
This step ends the procedure.
BB
This condition indicates that the received ETH-CC Frame matches to the MEP level,
but with an incorrect maintenance ID. This may be caused by receiving the
unexpected ETH-CC Frames from the far-end NE, or by the MEG/MEP
Configuration error in WebLCT.
Procedure 5-11
1.
Check the MEG/MEP Configuration, and correct it if it has any error.
2.
Retrieve the
Current Status
, and check if the
ETH-OAM Mismerge
alarm is
cleared.
3.
Is the
ETH-OAM Mismerge
alarm cleared?
YES:
This step ends the procedure.
NO:
Check the MEG/MEP Configuration of the far-end NE, and then go to
4.
Is MEG/MEP Configuration on the far-end site appropriate?
YES:
Contact NEC.
NO:
Correct them, and go to Step
5.
Retrieve the
Current Status
, and check if the
ETH-OAM Mismerge
alarm is
cleared. If the alarm is not cleared, contact NEC for the further maintenance
support.
This step ends the procedure.
ETH-OAM Mismerge
Summary of Contents for iPASOLINK EX Advanced
Page 29: ...2 8 END COMPOSITIONS GGS 000546 01E iPASOLINK EX Advanced INSTALLATION ...
Page 77: ...GGS 000547 01E GGS 000547 01E Printed in Japan 2016 by NEC Corporation ...
Page 87: ... x END CONTENTS GGS 000547 01E This page is intentionally left blank ...
Page 581: ...GGS 000548 01E GGS 000548 01E Printed in Japan 2016 by NEC Corporation ...
Page 775: ...GGS 000549 01E GGS 000549 01E Printed in Japan 2016 by NEC Corporation ...
Page 791: ...GGS 000552 01E GGS 000552 01E Printed in Japan 2016 by NEC Corporation ...