START UP AND SHUT DOWN
7-1
iPASOLINK EX Advanced:
I
NSTALLATION
GGS-000546-01E
7. START UP AND SHUT DOWN
7.1 Start Up iPASOLINK EX/A
CAUTIONS:
Equipment surface may be hot during the operation. Ensure not to
touch the equipment.
1. Verify that the power cable is properly connected:
Using Power Cable (SELV): The power cable should be connected at
DC –48V Port.
Using PoE Cable: The LAN cable should be connected at DCN (PoE)
Port.
2. SYSTEM LED (Green) starts blinking by turning on the equipment.
3. When the starting-up process is completed, the SYSTEM LED (Green)
stays on.
4. For the first time only, the equipment starts up disabling the radio output.
WARNING:
Once the equipment is powered on, wait at least 5 minutes before
turning its power off. Repeatedly turning the power on and off
within a short interval may cause the equipment failure.
7.2 Check Reception Level
Refer to
for checking the reception levels.
Summary of Contents for iPASOLINK EX Advanced
Page 29: ...2 8 END COMPOSITIONS GGS 000546 01E iPASOLINK EX Advanced INSTALLATION ...
Page 77: ...GGS 000547 01E GGS 000547 01E Printed in Japan 2016 by NEC Corporation ...
Page 87: ... x END CONTENTS GGS 000547 01E This page is intentionally left blank ...
Page 581: ...GGS 000548 01E GGS 000548 01E Printed in Japan 2016 by NEC Corporation ...
Page 775: ...GGS 000549 01E GGS 000549 01E Printed in Japan 2016 by NEC Corporation ...
Page 791: ...GGS 000552 01E GGS 000552 01E Printed in Japan 2016 by NEC Corporation ...