CONTROL ITEMS
4-11
iPASOLINK EX Advanced: O
PERATION
& M
AINTENANCE
GGS-000548-01E
10. The
Link OAM Loopback Control
window updates the information. Confirm
that the selected port indicates
Off
now.
Figure 4-15 Link OAM Loopback Control Window
11. When completed, click the
Maintenance
tool button on the
WebLCT
tool bar
to exit from the Maintenance Mode.
12. Confirm that the
MAINT
indicator on the tool bar changes from orange to
white.
This step ends the procedure.
Summary of Contents for iPASOLINK EX Advanced
Page 29: ...2 8 END COMPOSITIONS GGS 000546 01E iPASOLINK EX Advanced INSTALLATION ...
Page 77: ...GGS 000547 01E GGS 000547 01E Printed in Japan 2016 by NEC Corporation ...
Page 87: ... x END CONTENTS GGS 000547 01E This page is intentionally left blank ...
Page 581: ...GGS 000548 01E GGS 000548 01E Printed in Japan 2016 by NEC Corporation ...
Page 775: ...GGS 000549 01E GGS 000549 01E Printed in Japan 2016 by NEC Corporation ...
Page 791: ...GGS 000552 01E GGS 000552 01E Printed in Japan 2016 by NEC Corporation ...