CONTROL ITEMS
4-99
iPASOLINK EX Advanced: O
PERATION
& M
AINTENANCE
GGS-000548-01E
4.9.3 Switch (Swap) Program ROM
4.9.3.1
Switch (Swap) BB ROM
Proceeding through the following terminates the
WebLCT
and restarts
iPASOLINK EX/A.
Important:
To operate the Program ROM Switching, the system must be set into the
Maintenance mode; Do not cancel the Maintenance mode while controlling
the switching operation.
Procedure 4-29
1. Click the
Maintenance
tool button on the tool bar of the
WebLCT
to put the
system into the Maintenance Mode. The
MAINT
indicator on the tool bar
changes to orange.
2. In the
MENU
frame on the left, expand the
Equipment Utility
to select
Program ROM Switching
. The
Program ROM Switching
window appears.
3. Click the
BB
link in the Item field.
Figure 4-166 Program ROM Switching Window
The
Program ROM Switching (BB)
option window appears.
click
BB
Summary of Contents for iPASOLINK EX Advanced
Page 29: ...2 8 END COMPOSITIONS GGS 000546 01E iPASOLINK EX Advanced INSTALLATION ...
Page 77: ...GGS 000547 01E GGS 000547 01E Printed in Japan 2016 by NEC Corporation ...
Page 87: ... x END CONTENTS GGS 000547 01E This page is intentionally left blank ...
Page 581: ...GGS 000548 01E GGS 000548 01E Printed in Japan 2016 by NEC Corporation ...
Page 775: ...GGS 000549 01E GGS 000549 01E Printed in Japan 2016 by NEC Corporation ...
Page 791: ...GGS 000552 01E GGS 000552 01E Printed in Japan 2016 by NEC Corporation ...