4-10
CONTROL ITEMS
GGS-000548-01E
iPASOLINK EX Advanced: Operation & Maintenance
6.
The
Link OAM Loopback Control
window updates the information.
Check that
the status of the selected port indicates
On (Active)
.
Figure 4-12 Link OAM Loopback Control Window
To End Link OAM Loopback Test
7. Click the linked
On (Active)
. The
Link OAM Loopback
Control
option window
appears.
8. Select
Off
, then click the
OK
button.
Figure 4-13 Link OAM Loopback Control Option Window
9.
Information
dialog box appears. Click the
OK
button to proceed.
Figure 4-14 Information Dialog Box
Summary of Contents for iPASOLINK EX Advanced
Page 29: ...2 8 END COMPOSITIONS GGS 000546 01E iPASOLINK EX Advanced INSTALLATION ...
Page 77: ...GGS 000547 01E GGS 000547 01E Printed in Japan 2016 by NEC Corporation ...
Page 87: ... x END CONTENTS GGS 000547 01E This page is intentionally left blank ...
Page 581: ...GGS 000548 01E GGS 000548 01E Printed in Japan 2016 by NEC Corporation ...
Page 775: ...GGS 000549 01E GGS 000549 01E Printed in Japan 2016 by NEC Corporation ...
Page 791: ...GGS 000552 01E GGS 000552 01E Printed in Japan 2016 by NEC Corporation ...