CONTROL ITEMS
4-7
iPASOLINK EX Advanced: O
PERATION
& M
AINTENANCE
GGS-000548-01E
Figure 4-6 Information Dialog Box
8. L2 Loopback Control window updates the information.
Figure 4-7 L2 Loopback Control Window
9. When the loopback test ends, click
Maintenance
tool button on the
WebLCT
tool bar to exit from the Maintenance Mode.
10. Confirm that the
MAINT
color turns from orange to white.
This step ends procedure.
Summary of Contents for iPASOLINK EX Advanced
Page 29: ...2 8 END COMPOSITIONS GGS 000546 01E iPASOLINK EX Advanced INSTALLATION ...
Page 77: ...GGS 000547 01E GGS 000547 01E Printed in Japan 2016 by NEC Corporation ...
Page 87: ... x END CONTENTS GGS 000547 01E This page is intentionally left blank ...
Page 581: ...GGS 000548 01E GGS 000548 01E Printed in Japan 2016 by NEC Corporation ...
Page 775: ...GGS 000549 01E GGS 000549 01E Printed in Japan 2016 by NEC Corporation ...
Page 791: ...GGS 000552 01E GGS 000552 01E Printed in Japan 2016 by NEC Corporation ...