5-8
NETWORK MANAGEMENT
GGS-000547-01E
iPASOLINK EX Advanced:
S
ET
N
ETWORK
AND
S
YSTEM
P
ROVISIONING
Figure 5-9 Information Dialog Box
The
MODEM Port Setting
option box in the
Port/VLAN Setting
window
updates the information.
7.
Confirm that all the parameters are set:
Figure 5-10 Port/VLAN Setting Window
This step ends the procedure.
Summary of Contents for iPASOLINK EX Advanced
Page 29: ...2 8 END COMPOSITIONS GGS 000546 01E iPASOLINK EX Advanced INSTALLATION ...
Page 77: ...GGS 000547 01E GGS 000547 01E Printed in Japan 2016 by NEC Corporation ...
Page 87: ... x END CONTENTS GGS 000547 01E This page is intentionally left blank ...
Page 581: ...GGS 000548 01E GGS 000548 01E Printed in Japan 2016 by NEC Corporation ...
Page 775: ...GGS 000549 01E GGS 000549 01E Printed in Japan 2016 by NEC Corporation ...
Page 791: ...GGS 000552 01E GGS 000552 01E Printed in Japan 2016 by NEC Corporation ...