12. CC-Link CONNECTION (INTELLIGENT DEVICE STATION)
12.4 PLC Side Setting
12 - 25
CC-Link CON
N
ECTION
(IN
T
ELLIGENT DEVIC
E ST
A
T
ION)
12
12.4.5
Connecting to MELSEC-L
series with CC-Link Ver.2
compatible
This section describes the settings of the GOT and
MELSEC-L in the following case of the system
configuration.
POINT
POINT
POINT
(1) CC-Link module (L Series)
For details of the CC-Link module (L Series), refer
to the following manual.
MELSEC-L CC-Link System Master/Local
Module User's Manual
(2) CC-Link function built-in CPU
For details on the CC-Link function built-in CPU,
refer to the following manual.
MELSEC-L CC-Link System Master/Local
Module User's Manual
System configuration
(Example when using CC-Link module (L Series))
[Network parameter] of GX Developer
(1) Network parameter
: Necessary
: As necessary
: Not necessary
*1
Set the Start I/O No. of the CC-Link module according to the
system configuration.
<CC-Link module>
*1
Type
: Master station
Station No.
: Station No.0
Mode
: Remote net (Ver.3 mode)
All connect count
: 1
Transmission speed : 156kbps
<GOT>
(Use the default value for settings other
than the following.)
Station type
: Intelligent device
station
Station No.
: Station No.1
Expanded cyclic setting : Single
Number of
stations occupied
: Exclusive station
Transmission speed
: 156kbps
(Use the default value for the settings other than the following.)
■
[Controller Setting] of GT Designer3
■
[Network parameter] of GX Developer
Item
Set value
Setting
necessity at
GOT
connection
No. of boards in module
1
Start I/O No.
*1
0000
H
Operation setting
(Use default value)
Type
Master station (fixed)
Mode
Remote net
(Ver.2 mode)
All connect count
1
Remote input (RX)
X400
Remote output (RY)
Y400
Remote register (RWr)
D300
Remote register (RWw)
D200
Special relay (SB)
SB0
Special register (SW)
SW0
Retry count
(Use default value)
Automatic reconnection
station count
Stand by master station No.
PLC down select
Scan mode setting
Delay information setting
Station information setting
Refer to (2)
Remote device station initial
setting
(Use default value)
Interrupt setting
Summary of Contents for GOT2000 Series
Page 2: ......
Page 62: ...1 38 1 PREPARATORY PROCEDURES FOR MONITORING 1 6 Checking for Normal Monitoring ...
Page 64: ......
Page 80: ...2 16 2 DEVICE RANGE THAT CAN BE SET 2 6 MELSEC WS ...
Page 246: ...7 26 7 COMPUTER LINK CONNECTION 7 6 Precautions ...
Page 252: ...8 6 8 BUS CONNECTION 8 1 Connectable Model List ...
Page 256: ...8 10 8 BUS CONNECTION 8 2 System Configuration ...
Page 288: ...8 42 8 BUS CONNECTION 8 4 Precautions ...
Page 324: ...9 36 9 MELSECNET H CONNECTION PLC TO PLC NETWORK MELSECNET 10 CONNECTION PLC TO PLC NETWORK ...
Page 416: ......
Page 510: ...15 46 15 SERVO AMPLIFIER CONNECTION 15 7 Precautions ...
Page 518: ...16 8 16 ROBOT CONTROLLER CONNECTION 16 6 Precautions ...
Page 540: ...17 22 17 CNC CONNECTION 17 7 Precautions ...
Page 541: ...MULTIPLE GOT CONNECTIONS 18 GOT MULTI DROP CONNECTION 18 1 ...
Page 542: ......
Page 567: ...MULTI CHANNEL FUNCTION 19 MULTI CHANNEL FUNCTION 19 1 ...
Page 568: ......
Page 599: ...FA TRANSPARENT FUNCTION 20 FA TRANSPARENT FUNCTION 20 1 ...
Page 600: ......
Page 668: ...20 68 20 FA TRANSPARENT FUNCTION 20 7 Precautions ...
Page 670: ...REVISIONS 2 ...
Page 673: ......