15 - 106
MELSEC-Q
15 TROUBLESHOOTING
15.4 LED display functions
The states of QD75 and each axis control can be confirmed by the LEDs located on
the front panel of the QD75 main unit.
QD75M4
RUN
ERR
AX1
AX2
AX3
AX4
Each axis can be monitored by the states of the LEDs.
The operation and indications of the LEDs are as shown below.
Details of indication
Goes OFF
Goes ON
Flashes
Points to be
confirmed
Error Remedy
RUN
ERR
AX1
AX2
AX3
AX4
Extinguishment of
RUN LED
The hardware is
faulty or watch dog
timer error occurs.
If the RUN LED does not light up even when the
power is turned ON, the module may be out of order.
Replace the module with a new one.
RUN
ERR
AX1
AX2
AX3
AX4
Lighting of RUN LED,
Extinguishment of
ERR LED
The module is
normal.
—
RUN
ERR
AX1
AX2
AX3
AX4
Lighting of ERR LED System error
An operation condition setting error or installation PLC
CPU type error occurs.
(The setting and PLC CPU type are outside the
specification range.) Set the PLC CPU type to a one
contained in the specification.
RUN
ERR
AX1
AX2
AX3
AX4
Extinguishment of
AX1 to AX4 LEDs
During axis stop,
during axis standby
—
RUN
ERR
AX1
AX2
AX3
AX4
Lighting of AX1
(Same even if the
other axis is lit)
During axis
operation
This lights up from the positioning start until the
positioning is completed, stopped temporarily, or
stopped by error (corresponding at a ratio of 1 : 1 to
BUSY signals).
RUN
ERR
AX1
AX2
AX3
AX4
Flashing of ERR LED
Flashing of AX1 LED
(Same even if the
other axis flashes)
Axis error
Check the error observed on the buffer memory batch
processing monitor of a peripheral device and correct
the applicable parameters and positioning data.
RUN
ERR
AX1
AX2
AX3
AX4
Lighting of all LEDs
The hardware is
faulty
The module comes out of order. Replace the module
with a new one.
Summary of Contents for MELSEC-Q QD75M
Page 1: ...MELSEC Q QD75M Positioning Module User s Manual Details QD75M1 QD75M2 QD75M4 ...
Page 17: ...MEMO ...
Page 64: ...3 11 MELSEC Q 3 SPECIFICATIONS AND FUNCTIONS MEMO ...
Page 91: ...4 16 MELSEC Q 4 INSTALLATION WIRING AND MAINTENANCE OF THE PRODUCT MEMO ...
Page 108: ...5 17 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 112: ...5 21 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 116: ...5 25 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 138: ...5 47 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 182: ...5 91 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 188: ...5 97 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 194: ...5 103 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 253: ...5 162 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 274: ...6 21 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 275: ...6 22 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 276: ...6 23 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 277: ...6 24 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 278: ...6 25 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 279: ...6 26 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 280: ...6 27 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 281: ...6 28 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 282: ...6 29 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 283: ...6 30 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 284: ...6 31 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 285: ...6 32 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 286: ...6 33 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 287: ...6 34 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 288: ...6 35 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 289: ...6 36 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 290: ...6 37 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 291: ...6 38 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 292: ...6 39 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 293: ...6 40 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 294: ...6 41 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 295: ...6 42 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 296: ...6 43 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 297: ...6 44 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 298: ...6 45 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 299: ...6 46 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 300: ...6 47 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 301: ...6 48 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 302: ...6 49 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 303: ...6 50 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 304: ...6 51 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 305: ...6 52 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 332: ...7 7 MELSEC Q 7 MEMORY CONFIGURATION AND DATA PROCESS MEMO ...
Page 336: ...7 11 MELSEC Q 7 MEMORY CONFIGURATION AND DATA PROCESS MEMO ...
Page 347: ...MEMO ...
Page 477: ...9 116 MELSEC Q 9 MAJOR POSITIONING CONTROL MEMO ...
Page 539: ...11 36 MELSEC Q 11 MANUAL CONTROL MEMO ...
Page 663: ...14 18 MELSEC Q 14 DEDICATED INSTRUCTIONS MEMO ...
Page 771: ...Appendix 2 MELSEC Q APPENDICES MEMO ...
Page 845: ...Appendix 76 MELSEC Q APPENDICES MEMO ...
Page 855: ...Index 10 X X0 QD75 READY 3 15 X1 Synchronization flag 3 15 Z Zero speed Pr 130 5 74 ...