6 - 64
MELSEC-Q
6 PLC PROGRAM USED FOR POSITIONING CONTROL
[2] Starting by inputting external command signal
When starting positioning control by inputting the external command signal, the
start command can be directly input into the QD75. This allows the variation time
equivalent to one scan time of the PLC CPU to be eliminated. This is an effective
procedure when operation is to be started as quickly as possible with the start
command or when the starting variation time is to be suppressed. To start
positioning control by inputting the external command signal, set the "data
required to be set" and then turn ON the external command signal.
Restrictions
When starting by inputting the external command signal, the start complete signal
[X10, X11, X12, X13] will not turn ON.
Data required to be set
To execute positioning start with the external command signal, set parameter
(
Pr.42
) beforehand, and validate the "external command signal" with the
"external command signal validity setting program (program No. 5).
Buffer memory address
Setting item
Setting
value
Setting details
Axis 1 Axis 2 Axis 3 Axis 4
Pr.42
External command
function selection
0
Set to "0: External positioning start".
62
212
362
512
Cd.8
External command valid
1
Set to "1: Validate external command".
1505 1605 1705 1805
Refer to Chapter 5 "Data Used for Positioning Control" for details on the setting details.
Starting time chart
0
V
t
1(00)
External command signal
1
0
1
Cd. 8 External command valid
Dwell time
Operation pattern
Positioning start signal
PLC READY signal
QD75 READY signal
Positioning start complete signal
BUSY signal
Error detection signal
Positioning complete signal
Positioning data No.
Pr. 42 External command function selection
Cd. 3 Positioning start No.
[Y10]
[Y0]
[X0]
[X10]
[XC]
[X14]
[X8]
All axis servo ON
[Y1]
Fig. 6.11 Time chart for starting with external start signal
Summary of Contents for MELSEC-Q QD75M
Page 1: ...MELSEC Q QD75M Positioning Module User s Manual Details QD75M1 QD75M2 QD75M4 ...
Page 17: ...MEMO ...
Page 64: ...3 11 MELSEC Q 3 SPECIFICATIONS AND FUNCTIONS MEMO ...
Page 91: ...4 16 MELSEC Q 4 INSTALLATION WIRING AND MAINTENANCE OF THE PRODUCT MEMO ...
Page 108: ...5 17 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 112: ...5 21 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 116: ...5 25 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 138: ...5 47 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 182: ...5 91 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 188: ...5 97 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 194: ...5 103 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 253: ...5 162 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 274: ...6 21 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 275: ...6 22 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 276: ...6 23 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 277: ...6 24 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 278: ...6 25 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 279: ...6 26 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 280: ...6 27 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 281: ...6 28 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 282: ...6 29 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 283: ...6 30 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 284: ...6 31 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 285: ...6 32 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 286: ...6 33 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 287: ...6 34 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 288: ...6 35 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 289: ...6 36 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 290: ...6 37 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 291: ...6 38 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 292: ...6 39 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 293: ...6 40 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 294: ...6 41 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 295: ...6 42 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 296: ...6 43 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 297: ...6 44 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 298: ...6 45 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 299: ...6 46 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 300: ...6 47 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 301: ...6 48 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 302: ...6 49 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 303: ...6 50 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 304: ...6 51 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 305: ...6 52 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 332: ...7 7 MELSEC Q 7 MEMORY CONFIGURATION AND DATA PROCESS MEMO ...
Page 336: ...7 11 MELSEC Q 7 MEMORY CONFIGURATION AND DATA PROCESS MEMO ...
Page 347: ...MEMO ...
Page 477: ...9 116 MELSEC Q 9 MAJOR POSITIONING CONTROL MEMO ...
Page 539: ...11 36 MELSEC Q 11 MANUAL CONTROL MEMO ...
Page 663: ...14 18 MELSEC Q 14 DEDICATED INSTRUCTIONS MEMO ...
Page 771: ...Appendix 2 MELSEC Q APPENDICES MEMO ...
Page 845: ...Appendix 76 MELSEC Q APPENDICES MEMO ...
Page 855: ...Index 10 X X0 QD75 READY 3 15 X1 Synchronization flag 3 15 Z Zero speed Pr 130 5 74 ...