8 - 2
MELSEC-Q
8 OPR CONTROL
8.1 Outline of OPR control
8.1.1 Two types of OPR control
In "OPR control" a position is established as the starting point (or "OP") when carrying out
positioning control, and positioning is carried out toward that starting point.
It is used to return a machine system at any position other than the OP to the OP when the
QD75 issues a "OPR request" with the power turned ON or others, or after a positioning
stop.
In the QD75, the two types of controls shown below are defined as "OPR control", following
the flow of the OPR work.
These two types of OPR control can be executed by setting the "OPR parameters" ,setting
"Positioning start No. 9001" and "positioning start No. 9002" prepared beforehand in the
QD75 to "
Cd.3
Positioning start No.", and turning ON the positioning start signal.
The PSTRT start numbers of the dedicated instruction can also be set to 9001 or 9002 to
execute the OPR control. (For details, refer to Chapter 14 "Dedicated instructions".)
(1) Establish a positioning control OP
– "Machine OPR" (positioning start No. 9001)
(2) Carry out positioning toward the OP
– "Fast OPR" (positioning start No. 9002).
The "machine OPR" in (1) above must always be carried out before executing the "fast
OPR" in (2).
!
CAUTION
In the case of the absolute position system, use the PLC program to check the OPR request
before performing the positioning operation.
Failure to observe this could lead to an accident such as a collision.
REMARK
OPR request
The "OPR request flag" (
Md.31
Status: b3) must be turned ON in the QD75, and a
machine OPR must be executed in the following cases.
•
When the power is turned ON (in the case of the absolute position system, however,
the "OPR request flag" is not established.)
•
When the OPR is not performed in the absolute position system
•
When the Machine OPR starts
The address information stored in the QD75 cannot be guaranteed while the "OPR
request flag" is ON.
The "OPR request flag" turns OFF and the "OPR complete flag" (
Md.31
Status: b4)
turns ON if the machine OPR is executed and is completed normally.
Summary of Contents for MELSEC-Q QD75M
Page 1: ...MELSEC Q QD75M Positioning Module User s Manual Details QD75M1 QD75M2 QD75M4 ...
Page 17: ...MEMO ...
Page 64: ...3 11 MELSEC Q 3 SPECIFICATIONS AND FUNCTIONS MEMO ...
Page 91: ...4 16 MELSEC Q 4 INSTALLATION WIRING AND MAINTENANCE OF THE PRODUCT MEMO ...
Page 108: ...5 17 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 112: ...5 21 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 116: ...5 25 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 138: ...5 47 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 182: ...5 91 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 188: ...5 97 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 194: ...5 103 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 253: ...5 162 MELSEC Q 5 DATA USED FOR POSITIONING CONTROL MEMO ...
Page 274: ...6 21 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 275: ...6 22 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 276: ...6 23 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 277: ...6 24 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 278: ...6 25 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 279: ...6 26 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 280: ...6 27 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 281: ...6 28 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 282: ...6 29 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 283: ...6 30 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 284: ...6 31 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 285: ...6 32 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 286: ...6 33 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 287: ...6 34 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 288: ...6 35 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 289: ...6 36 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 290: ...6 37 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 291: ...6 38 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 292: ...6 39 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 293: ...6 40 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 294: ...6 41 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 295: ...6 42 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 296: ...6 43 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 297: ...6 44 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 298: ...6 45 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 299: ...6 46 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 300: ...6 47 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 301: ...6 48 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 302: ...6 49 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 303: ...6 50 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 304: ...6 51 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 305: ...6 52 MELSEC Q 6 PLC PROGRAM USED FOR POSITIONING CONTROL ...
Page 332: ...7 7 MELSEC Q 7 MEMORY CONFIGURATION AND DATA PROCESS MEMO ...
Page 336: ...7 11 MELSEC Q 7 MEMORY CONFIGURATION AND DATA PROCESS MEMO ...
Page 347: ...MEMO ...
Page 477: ...9 116 MELSEC Q 9 MAJOR POSITIONING CONTROL MEMO ...
Page 539: ...11 36 MELSEC Q 11 MANUAL CONTROL MEMO ...
Page 663: ...14 18 MELSEC Q 14 DEDICATED INSTRUCTIONS MEMO ...
Page 771: ...Appendix 2 MELSEC Q APPENDICES MEMO ...
Page 845: ...Appendix 76 MELSEC Q APPENDICES MEMO ...
Page 855: ...Index 10 X X0 QD75 READY 3 15 X1 Synchronization flag 3 15 Z Zero speed Pr 130 5 74 ...