
D-53
13. Remove the E-ring and gear. Remove one screw and the bias contact plate. Then, remove the
bushing for the Developer Conveying/Agitating Screw.
14. Remove three screws and the cord clamp.
15. Remove two screws and the bushing for the Bucket Roller.
16. Remove two screws each at the front and rear and the 1st/2nd Sleeve/Magnet Rollers Assy.
17. Remove the Toner Replenishing Sleeve/Magnet Roller and the bushings on the front and rear.
18. Disassemble the 1st/2nd Sleeve/Magnet Rollers Assy as illustrated below.
1155D088AA
When reinstalling the bushing, twist it into position.
NOTE
When reinstalling the bushings, twist it into position.
NOTE
1075D225AA
1075D226AB
When reinstalling the bushings, twist it into position.
NOTE
Summary of Contents for Di620
Page 1: ...Di 620 GENERAL MECHANICAL ELECTRICAL ...
Page 5: ...1151SBG000CA GENERAL ...
Page 19: ...1155SAM000CA MACHANICAL ELECTRICAL ...
Page 140: ...M 121 Multi Copy Cycle Immediately After Warm up in Early Morning normal CPM 62 1155M082CA ...
Page 153: ...Di620 SWITCHES ON PWBs TECH REP SETTINGS 1155SBS000AA ...
Page 211: ...Di620 TROUBLESHOOTING ...
Page 238: ...M E M O ...
Page 304: ...Di620 DIS REASSEMBLY ADJUSTMENT ...
Page 427: ......
Page 428: ......
Page 429: ......
Page 430: ......
Page 433: ......
Page 434: ......
Page 435: ......
Page 436: ......
Page 437: ......
Page 438: ......
Page 439: ......
Page 440: ......
Page 441: ......
Page 442: ......
Page 443: ......
Page 444: ......
Page 445: ......
Page 446: ......
Page 447: ......
Page 448: ......
Page 449: ......
Page 450: ......
Page 451: ......
Page 452: ......
Page 453: ......
Page 454: ......
Page 455: ......
Page 456: ......
Page 457: ......
Page 458: ......
Page 459: ......
Page 460: ......
Page 461: ......
Page 462: ......
Page 463: ......
Page 464: ......
Page 465: ......