
6
(3) When you connect the digital load cell in parallel
The hopper scale, the track scale, etc., have the case to connect the several pieces of the digital
load cell in parallel. The parallel connections can be easily done by using optional DB-307
(Summing type junction box).
RE
D
BL
U
WH
T
GR
N
Y
E
L (
S
hi
eld)
Special communication cable
Junction box
WHT
RED
GRN
YEL(Shield)
BLU
WHT
RED
GRN
YEL(Shield)
BLU
WHT
RED
GRN
YEL(Shield)
BLU
WHT
RED
GRN
YEL(Shield)
BLU
WHT
RED
GRN
YEL(Shield)
BLU
to CSD-401
RD
OR
BK
WH
GN
BL
YE
1W
1R
1G
1B
1Y
2W
2R
2G
2B
2Y
3W
3R
3G
3B
3Y
4W
4R
4G
4B
4Y
Use exclusive corresponding cable. Maximum 200m is able to extend when using recommended cable.
Recommended cable: CL2/2464-3599-DS 2P×18AWG(Solar battery)
Do not connect except our digital load cell. It may cause an unexpected failure to the instrument.
Our Junction box CB-307 is building in the terminating resistance of 120
Ω
. If you use another junction box,
install the terminating resistance of 120
Ω
connect between Green and Blue of CSD-401.
Summary of Contents for CSD-401
Page 1: ...DIGITAL INDICATOR CSD 401 INSTRUCTION MANUAL EN294 1366 D ...
Page 2: ......
Page 16: ......
Page 148: ... ...
Page 149: ......