215922
206
Revision A
1019607
A
Figure 4.190: HPT Display
4.
Press soft key 3 (A) to remove the float.
1014786
A
Figure 4.191: GSL
5.
Park the windrower on level ground.
6.
Press header raise button (A) on the ground speed
lever (GSL) until the header reaches maximum height.
Continue to hold the header raise button for 3
–
4 seconds
to rephase the lift cylinders.
1015882
A
B
Figure 4.192: Lift Linkage
7.
Lower the header to approximately 150 mm (6 in.) off the
ground.
8.
Ensure that member (A) is against link (B).
9.
Shut down the engine, and remove the key from
the ignition.
10. Measure the distance to the ground at both ends of the
header to determine if the header is level.