Installation
Electrical installation
4.2.2
Controller protection
4-21
L
EDSVS9332S-B EN 3.0
4.2.2
Controller protection
Stop!
The controllers contain electrostatically sensitive components.
z
Prior to assembly and service operations, the personnel must be free of electrostatic charge:
– Discharge by touching the PE fixing screw or another earthed metal part in the control
cabinet.
z
Length of the screws for connecting the shield cable/shield sheet for the types 9327 to 9332:
< 12 mm
z
Controller protection by means of external fuses. (
3-7)
z
Protect unused control inputs and outputs with plugs or covers (included in the scope of
supply) for the Sub-D inputs.
z
Frequent mains switching may lead to an overload of the internal starting current limitation. If
the mains is switched cyclically, the controller can be switched on every three minutes as a
maximum.
z
The controllers 9324, 9326, 9328 and 9329 must only be operated with the appropriate mains
filters. (
3-8)
z
In case of condensation, connect the controller to the mains voltage only after the visible
humidity has evaporated.
4.2.3
Motor protection
z
Extensive protection against overload:
– By overcurrent relays or temperature monitoring.
– We recommend to use a PTC thermistor or thermal contact (NC contact) for motor
temperature monitoring. (Lenze three-phase AC motors are fitted with thermal contacts as
standard)
– PTC thermistor or thermal contact (NC contact) can be connected to the controller.
z
Only use motors with an insulation suitable for the inverter operation:
– Insulation resistance: Max. û = 1.5 kV, max. du/dt = 5 kV/
μ
s
– Lenze three-phase AC motors are designed for inverter operation.
– When using motors with an insulation resistance which is not suitable for the inverter
operation, please contact your motor supplier.
Summary of Contents for EVS 9300 series
Page 1: ...L System Manual EDSVS9332S 31S Global Drive 9300 servo inverter 31S...
Page 28: ...Contents ii L EDSVS9332S B EN 3 0...
Page 38: ...Technical data 3 6 Dimensions 3 10 L EDSVS9332S B EN 3 0...
Page 90: ...Contents ii L EDSVS9332S C EN 3 0...
Page 108: ...During operation Operating notes 6 6 l EDSVS9332S C EN 3 0...
Page 114: ...Contents iv L EDSVS9332S D11 EN 3 0...
Page 378: ...Contents ii L EDSVS9332S D12 EN 3 0...
Page 452: ...Contents ii L EDSVS9332S E EN 3 0...
Page 466: ...Contents ii L EDSVS9332S K EN 3 0...
Page 467: ...Selection help 11 1 l EDSVS9332S K EN 3 0 Part K 11 Selection help 11 1 See folder Planning...
Page 468: ...Selection help 11 2 l EDSVS9332S K EN 3 0...
Page 485: ...Contents i L EDSVS9332S L EN 3 0 13 Signal flow diagrams 13 1...
Page 486: ...Contents ii L EDSVS9332S L EN 3 0...
Page 488: ...Signal flow charts 13 2 L EDSVS9332S L EN 3 0...
Page 491: ...Contents i L EDSVS9332S M EN 3 0 14 Glossary 14 1 14 1 Index 14 3...
Page 492: ...Contents ii L EDSVS9332S M EN 3 0...