Maintenance
W9272-8135-1
209
05/2020
Swing bracket - grease
Lubricate both greasing points (see figure to the right) – see the
"Operating materials" section (page 180) – by injecting grease
until fresh grease emerges.
Other greasing points
Start the engine (page 96).
Position the boom, arm, and dozer as shown in the figure. Stop the engine, remove the key. Refer to the "Op-
erating the controls during excavation work" section) (page 117).
Lubricate all greasing points with grease – see the "Operating materials" section (page 180) – until fresh
grease emerges.
Wipe emerged grease off immediately and store dirty
cleaning cloths in the containers provided for disposal.
Wipe emerged grease off immediately and store dirty cleaning cloths in the containers provided for
disposal.
Summary of Contents for U50-5
Page 1: ...GB COMPACT EXCAVATOR MODEL U50 5 OPERATING INSTRUCTIONS W9272 8135 1 Original 05 2020...
Page 38: ...36 W9272 8135 1 05 2020 Safety rules...
Page 54: ...52 W9272 8135 1 05 2020 Description of the machine...
Page 74: ...72 W9272 8135 1 05 2020 Assembly and functions...
Page 164: ...162 W9272 8135 1 05 2020 Operation...
Page 222: ...220 W9272 8135 1 05 2020 Maintenance...
Page 224: ...222 W9272 8135 1 05 2020 Safety inspection...
Page 234: ...232 W9272 8135 1 05 2020 Software information...
Page 235: ...Software information W9272 8135 1 233 05 2020...
Page 236: ......