Maintenance
W9272-8135-1
187
05/2020
Coolant - change
Total cooling system capacity: 7 l
Open the engine compartment and side cover (page 154).
Remove the radiator cap (1) by turning it anticlockwise.
Open the central coolant drain plug (1) and drain the coolant
completely.
Purge the cooling system if the coolant is very dirty. To do this,
spray water without additives into the cooling system with a hose
through the filler opening until clear water emerges at the outlet.
Close the central drain.
Remove the coolant expansion reservoir (1) and drain it, clean-
ing it if necessary. Refit the reservoir.
Fill the premixed coolant into the radiator and expansion reser-
voir.
Start the engine (page 96) and let it run at idle speed to warm
up.
Stop the engine (page 99).
Check the coolant level (page 84), adding coolant if necessary
(page 182).
Close the engine compartment and side cover.
Drain the coolant only when the engine is cold.
Fill the coolant in a container and dispose of it in ac-
cordance with the prevailing environmental protection
regulations.
Do not operate the cooling system with pure water
(even in summer). The antifreeze also contains a cor-
rosion inhibitor.
1
1
STOP
1
1
1
1
Summary of Contents for U50-5
Page 1: ...GB COMPACT EXCAVATOR MODEL U50 5 OPERATING INSTRUCTIONS W9272 8135 1 Original 05 2020...
Page 38: ...36 W9272 8135 1 05 2020 Safety rules...
Page 54: ...52 W9272 8135 1 05 2020 Description of the machine...
Page 74: ...72 W9272 8135 1 05 2020 Assembly and functions...
Page 164: ...162 W9272 8135 1 05 2020 Operation...
Page 222: ...220 W9272 8135 1 05 2020 Maintenance...
Page 224: ...222 W9272 8135 1 05 2020 Safety inspection...
Page 234: ...232 W9272 8135 1 05 2020 Software information...
Page 235: ...Software information W9272 8135 1 233 05 2020...
Page 236: ......