CONTENTS
SPECIFICATION TABLE ......................................................................................... 3
TRAVELING SPEEDS ............................................................................................. 6
INSTRUMENT PANEL AND CONTROLS................................................................. 12
INSTRUMENT PANEL, SWITCHES AND HAND CONTROLS ............................. 12
FOOT AND HAND CONTROLS ............................................................................ 14
Initial Setting ................................................................................................................... 24
Setting the Power Shift Transmission............................................................................. 26
Distance Measuring ........................................................................................................ 27
Basic Information Monitor/Performance Monitor ............................................................ 29
INDICATOR ........................................................................................................... 35
K-MONITOR (Part 1).............................................................................................. 36
Outline ............................................................................................................................ 36
Names of Parts and Their Handling................................................................................ 37
Basic Procedures............................................................................................................ 39
System Basic Settings .................................................................................................... 41
Setting the 3-Point Hitch................................................................................................. 44
Setting the Remote Control Valve .................................................................................. 46
Setting the Drivability ...................................................................................................... 48
Setting the PTO .............................................................................................................. 50
Setting the Engine/Transmission (Power Shift) .............................................................. 51
Setting the Engine/Transmission (CVT) ......................................................................... 54
Setting the Headland Management System ................................................................... 56
Operating Conditions ...................................................................................................... 67
Live View Camera........................................................................................................... 70
Calculator........................................................................................................................ 70
Initial Setting ................................................................................................................... 70
Data Import and Export................................................................................................... 70
Screenshot...................................................................................................................... 71
Failure Messages ........................................................................................................... 72
Checking the Items Reaching the Maintenance Interval ................................................ 73
Resetting Procedure....................................................................................................... 74
EXHAUST AFTERTREATMENT DEVICES........................................................... 75
Summary of Contents for M7131
Page 16: ......
Page 24: ...SAFE OPERATION 8 7 DANGER WARNING AND CAUTION LABELS ...
Page 25: ... 9 SAFE OPERATION ...
Page 26: ...SAFE OPERATION 10 ...
Page 27: ... 11 SAFE OPERATION ...
Page 28: ...SAFE OPERATION 12 ...
Page 29: ... 13 SAFE OPERATION ...
Page 30: ...SAFE OPERATION 14 ...
Page 32: ......
Page 41: ...9 IMPLEMENT LIMITATIONS Hitch made by SCHARMÜLLER ...
Page 66: ...INTELLIPANEL TM CONTROL 34 1 Screen selector switch ...
Page 166: ...OPERATING THE TRACTOR 134 1 Field out button 2 Field in button 3 Indicator ...