CAB OPERATION
194
A
Please refer to Front Loader Operator’s manual for
detail of electric wiring connection.
B
ISOBUS Monitor Socket
An implement monitor meeting ISO Standard 11783 may
be connected to the socket.
B
Signal Socket according to ISO Standard
11786
When connecting the connectors of implements meeting
ISO Standard 11786 to this socket, the following signals
will be transmitted from the tractor to the implement.
Based on the transmitted signals, the tractor can control
implement operations including stopping, operation
restart, adjustment of dispersal amount (fertilizer, for
example) etc.
A
Implement side default settings are required to adjust
the dispersal amount and so on.
C
Signals from the Signal Socket
(1) Loader electrical outlet
(1) ISOBUS monitor socket
Output Signals
Remarks
1
Actual traveling speed
Operation with GPS
mounted
2
Travel speed
Speed calculated from
engine rpm etc.
3
Rear 3-point hitch
position
Lift arm height displayed
by voltage
4
Operating or halted
When raising lift arm:
Operation halted
When lowering lift arm:
Operating
5
Rear PTO rpm
6
Power supply (5 A)
7
Ground
(1) Signal socket
Summary of Contents for M7131
Page 16: ......
Page 24: ...SAFE OPERATION 8 7 DANGER WARNING AND CAUTION LABELS ...
Page 25: ... 9 SAFE OPERATION ...
Page 26: ...SAFE OPERATION 10 ...
Page 27: ... 11 SAFE OPERATION ...
Page 28: ...SAFE OPERATION 12 ...
Page 29: ... 13 SAFE OPERATION ...
Page 30: ...SAFE OPERATION 14 ...
Page 32: ......
Page 41: ...9 IMPLEMENT LIMITATIONS Hitch made by SCHARMÜLLER ...
Page 66: ...INTELLIPANEL TM CONTROL 34 1 Screen selector switch ...
Page 166: ...OPERATING THE TRACTOR 134 1 Field out button 2 Field in button 3 Indicator ...