3-44 Keysight N5247B Service Guide
Tests and Adjustments
Performance Tests
3-
Figure 3-14
Dynamic Accuracy at Low Frequency Setup
If the Analyzer Fails this Test:
— If the analyzer fails this test, rerun the test.
— If the analyzer fails this test repeatedly, run the DC continuity test. Refer to
“DC Continuity Test the LFE Board and Test Ports (Available With Low
Frequency Extension (LFE) Installed Option 205/425)” on page 3-53
and to
“Removing and Replacing the A70 or A75 Low Frequency Extension (LFE)
— If the analyzer still fails this test, replace the A70 LFE board and repeat this
“Removing and Replacing the A70 or A75 Low Frequency
Extension (LFE) Board” on page 7-72
.
— If the analyzer fails this test repeatedly, replace the A23 mixer brick for a
Port 1 or Port 2 failure or the A24 mixer brick for a Port 3 or Port 4 failure,
then repeat this test. Refer to
“Removing and Replacing the A27 and A28
— If the analyzer still fails this test, replace the A12 SPAM board and repeat
this test. Refer to
“Removing and Replacing the A4–A17 Boards” on
.
Summary of Contents for N5247B
Page 10: ...10 Keysight N5247B Service Guide Contents ...
Page 96: ...3 66 Keysight N5247B Service Guide Tests and Adjustments Adjustments 3 ...
Page 157: ...Keysight N5247B Service Guide 4 61 Troubleshooting This page left intentionally blank ...
Page 268: ...6 30 Keysight N5247B Service Guide Replaceable Parts Replaceable Parts Listings 6 ...
Page 270: ...6 32 Keysight N5247B Service Guide Replaceable Parts Replaceable Parts Listings 6 ...
Page 373: ...Keysight N5247B Service Guide 6 135 Replaceable Parts Replaceable Parts Listings ...
Page 426: ...6 188 Keysight N5247B Service Guide Replaceable Parts Replaceable Parts Listings 6 ...
Page 565: ...Installation Note Xxxxx xxxxx 3 ...