– 11 –
2-11. Handling the cords
➡
A
❷
❶
❹
❸
1) Bring the cords under the table into the con-
trol box.
2) Put the cord brought into the control box
through cord exit plate
❶
and fix cable clip
band
❷
.
3) Install control box cover
❸
with four set-
screws
❹
.
Arrange the cord so that it is not
tensed or hitched even when the ma
-
chine head is tilted. (See
A
section.)
For the purpose of preventing the
cord breakage, take care not to allow
the cords to be caught between the
control box and control box cover
❸
when attaching the latter.
DANGER :
1. To prevent personal injuries caused by electric shock hazards or abrupt start of the sewing ma
-
chine, carry out the work after turning OFF the power switch and a lapse of 5 minutes or more.
2. To prevent accidents caused by unaccustomed work or electric shock, request the electric expert
or engineer of our dealers when adjusting the electrical components.
Summary of Contents for SC-956
Page 1: ...INSTRUCTION MANUAL LH 4500C Series SC 956...
Page 180: ...175 11 GAUGE PARTS LIST 43 22 TABLE OF EXCHANGING GAUGE PARTS LH 4578C TYPE F LH 4578C F type...
Page 181: ...176 23 TABLE OF EXCHANGING GAUGE PARTS LH 4578C 7 LH 4578C 7...
Page 182: ...177 47 24 TABLE OF EXCHANGING GAUGE PARTS LH 4588C 7 LH 4588C 7...