– 6 –
2-4. Installing the thread stand
Assemble the thread stand, set it up on the ma-
chine table using the installation hole in the table
and tighten nut
❶
gently.
When you use power supplied by the overhead
power line, pass the power supply cord through
hollow spool rest rod
❷
.
❷
❶
300 mm from the top
surface of table
2-5. Installing the control box
0.8 mm
❷
❸
❹
❺
❻
❶
1) Secure toothed washer
❷
and vibration-proof rubber
❸
to control box
❶
. (At four locations)
* Tighten the toothed washer until it protrudes the control box surface by 0.8 mm.
2) Secure control box mounting plate
❹
to the control box with plain washers
❺
and nuts
❻
. (At
four locations)
* Secure the mounting plate by fitting the screws against the U-groove in the mounting plate.
2-5-1. Preparing for installation of the control box
Summary of Contents for SC-956
Page 1: ...INSTRUCTION MANUAL LH 4500C Series SC 956...
Page 180: ...175 11 GAUGE PARTS LIST 43 22 TABLE OF EXCHANGING GAUGE PARTS LH 4578C TYPE F LH 4578C F type...
Page 181: ...176 23 TABLE OF EXCHANGING GAUGE PARTS LH 4578C 7 LH 4578C 7...
Page 182: ...177 47 24 TABLE OF EXCHANGING GAUGE PARTS LH 4588C 7 LH 4588C 7...