List of Figures
P/N 960-100189R_Rev. 4 {EDP #148850}
© 2016, JAPAN CASH MACHINE CO., LTD.
vi
Page
VEGA™ Series Banknote Validator
Figure 2-16 VEGA Banknote Validator Operational Flowchart (Stacking) ............... 2-9
Figure 2-17 VEGA Banknote Validator Operational Flowchart (Reject) ................. 2-10
Figure 4-1 Cash Box & Course Path Reversing Guide Cover Removal ................. 4-1
Figure 4-2 Cash Box Frame Removal .................................................................... 4-1
Figure 4-3 Upper Assembly Separation (Part 1) .................................................... 4-2
Figure 4-4 Upper Assembly Separation (Part 2) .................................................... 4-2
Figure 4-5 Front Bezel Removal ............................................................................. 4-2
Figure 4-6 Flap Positioning Spring Removal .......................................................... 4-2
Figure 4-7 Shaft and Flap #1 & #2 Removal .......................................................... 4-2
Figure 4-8 Flap Lever Arm Reassembly ................................................................. 4-3
Figure 4-9 Upper Transport Assembly Removal .................................................... 4-3
Figure 4-10 Main CPU Board Removal .................................................................... 4-3
Figure 4-11 Upper Sensor Board Removal .............................................................. 4-3
Figure 4-12 Base Unit Carrier Removal (Part 1) ...................................................... 4-4
Figure 4-13 Base Unit Carrier Removal (Part 2) ...................................................... 4-4
Figure 4-14 Unplug Inter-Assembly Harnesses ........................................................ 4-4
Figure 4-15 Sub-Circuit Board Removal ................................................................... 4-4
Figure 4-16 Gear Box Motor Assembly Removal ..................................................... 4-5
Figure 4-17 Stacker & Feed Motor Removal ............................................................ 4-5
Figure 4-18 Sub-Sensor Board Removal ................................................................. 4-5
Figure 4-19 Lower Sensor Board Removal .............................................................. 4-6
Figure 4-20 Tension Pulley Unit Removal ................................................................ 4-6
Figure 4-21 Belt Cover Removal .............................................................................. 4-6
Figure 4-22 Transport Belt Removal ........................................................................ 4-6
Figure 4-23 Stacker Unit Removal (Part 1) .............................................................. 4-7
Figure 4-24 Stacker Unit Removal (Part 2) .............................................................. 4-7
Figure 4-25 Cash Box Turn Course Removal .......................................................... 4-7
Figure 4-26 E-Ring, Gear & Clutch Shaft Removal .................................................. 4-7
Figure 4-27 Right Stacker Belt Removal .................................................................. 4-8
Figure 4-28 Left Stacker Belt Removal ..................................................................... 4-8
Figure 4-29 Transport Belt Installation 1 .................................................................. 4-8
Figure 4-30 Transport Belt Installation 2 .................................................................. 4-8
Figure 5-1 Wiring Diagram (with Magnetic Sensor Board) ..................................... 5-1
Figure 5-2 Wiring Diagram (with Magnetic Sensor Board) ..................................... 5-2
Figure 6-1 Tool and Harness Connection ............................................................... 6-1
Figure 6-2 Tool and Harness Connection ............................................................... 6-1
Figure 6-3 Hardware Wizard Welcome Screen ...................................................... 6-1
Figure 6-4 Installation Path Selection Screen ........................................................ 6-2
Figure 6-5 Install Option Screen ............................................................................. 6-2
Figure 6-6 Installation Warning Screen .................................................................. 6-2
Figure 6-7 Hardware Wizard Completion Screen ................................................... 6-2
Figure 6-8 DIP Switch DS1 Initial Setting ............................................................... 6-2
Figure 6-9 UBA Download Screen ......................................................................... 6-3