![JCM GLOBAL VEGA Series Operation And Maintenance Manual Download Page 45](http://html1.mh-extra.com/html/jcm-global/vega-series/vega-series_operation-and-maintenance-manual_3554016045.webp)
P/N 960-100189R_Rev. 4 {EDP #148850}
© 2016, JAPAN CASH MACHINE CO., LTD.
4 - 3
Disassembly/Reassembly
VEGA™ Series Banknote Validator
Section 4
14. Carefully press-in, and individually pull upward
on the six (6) Plastic Retaining Tabs one at a time
on the Upper Transport Unit (Figure 4-9
a
1
through
a
6
), and carefully remove the Upper
Transport Unit up and off the Lower Transport
Unit (Figure 4-9
b
).
15. Remove the four (4) Board Mounting Screws
a
1
through
a
4
) retaining the Main
CPU Circuit Board in place (Figure 4-10
b
). Care-
fully lift the Main CPU Board up, and unplug the
single Circuit Board Connector from the Board
(Figure 4-10
c
); then lift the CPU Board up and
off the Upper Transport Unit (Figure 4-10
d
).
Upper Sensor Circuit Board
Removal
To remove the VEGA Unit’s Upper Sensor Board,
proceed as follows:
1. Remove the two (2) Mounting Screws (Figure 4-
a
1
&
a
2
) securing the Upper Sensor Board in
place (Figure 4-11
b
), and unplug the single Cir-
cuit Board Connector (Figure 4-11
c
) located on
the Upper Sensor Board.
2. Left the Sensor Board up and off the Upper
Transport Unit (Figure 4-11
d
).
Figure 4-8
a
b
c
d
Figure 4-8
Flap Lever Arm Reassembly
Figure 4-9
a
4
b
c
a
5
a
6
a
3
a
2
1
Figure 4-9
Upper Transport Assembly Removal
Figure 4-10
c
b
d
a
1
a
2
a
3
4
Figure 4-10
Main CPU Board Removal
Figure 4-11
b
c
d
a
1
Figure 4-11
Upper Sensor Board Removal