Disassembly/Reassembly
2. Lift the Lower Sensor Board up and off the Car-
rier Base.
Transport Belt Removal
To remove the VEGA Unit’s Transport Belts,
proceed as follows:
1. Remove the single (1) Mounting Screw (Figure 4-
a
) retaining the Tension Pulley Assembly in
place (Figure 4-20
b
). Take the Tension Pulley
Assembly off the Carrier Base (Figure 4-20
).
2. Remove the three (3) Screws (Figure 4-21
a
1
through
a
3
) retaining the Belt Cover (Figure 4-21
b
) to the Carrier Base (Figure 4-21
c
).
3. Remove the Belt Cover Assembly from the Car-
rier Base.
4. Remove the two (2) Transport Belts (Figure 4-22
a
1
&
a
2
) from the Carrier Base (Figure 4-22
).
Figure 4-19
b
c
d
a
1
a
2
Figure 4-19
Lower Sensor Board Removal
Figure 4-20
b
c
d
1
d
2
Figure 4-20
Tension Pulley Unit Removal
NOTE: Be careful that the two (2) side
Tension Pulleys do not fall out of the
Assembly (Figure 4-20
d
1
&
d
2
) when
removing the Tension Pulley Assembly.
Figure 4-21
c
b
1
a
2
a
3
Figure 4-21
Belt Cover Removal
b
a
1
a
2
e
1
e
2
e
3
e
4
e
5
e
6
d
2
d
1
Figure 4-22
Transport Belt Removal
NOTE: Be careful not to lose the eight (8)
Pulley Pins when removing the Tension
Pulley Assembly (Figure 4-22
d
1
&
d
2
,
e
1
through
e
6
).
NOTE: The two (2) End Pulleys located on
each side of the Carrier Base (Figure 4-22
d
1
&
d
2
) are a different shape from the
other Pulleys (Figure 4-22
e
1
through
e
6
).
Be sure to replace them in their correct